EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
RANS21RB
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (676)
Research
Workshop
- (4)
Empennage
- (37)
Fuselage
- (155)
Firewall
- (19)
Tail Feathers
- (4)
Wings
- (99)
Controls
- (20)
Avionics
- (52)
Lighting
- (9)
Instrument Panel
- (8)
Landing Gear
- (6)
Engine
- (82)
Propeller
Fuel System
- (6)
Interior Finish
- (28)
-
Wiring and paint prep
-
Wing wires and...
-
Seats
-
Center console,...
-
Center Console
-
Paint
-
Side panels
-
Interior Trim panels
-
Wiring
-
Finish work
-
Wiring and trim panels
-
Brake Lines
-
Interior panels and...
-
Floorboard carpet...
-
Prep
-
Center Console
-
Rear Rudder Return...
-
Fresh Air Vents
-
Completed Interior...
-
Flap Handle Closeout
-
Cockpit trim panels
-
Cockpit
-
Cockpit interior
-
Interior Closeout...
-
Interior closeout...
-
Control Stick and...
-
Interior Closeout...
-
Closeout panels
Paint / Decals
- (90)
Inspection
- (3)
Tools
Inventory
- (3)
Kit Delivery
- (1)
Reassembly
- (50)
Builder Name:
Randall Brooks
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
1988
Total Flight Time:
Start/Last Date:
Apr 03, 2021 - No Finish Date
Engine:
Titan IO-340 180HP
Propeller:
Whirlwind
Friendly URL:
https://eaabuilderslog.org?s=RANS21RB
Home or Last Project Picture
Apr 26, 2022
Cockpit interior
- (5 hours)
Category: Interior Finish
Deburred and riveted forward baggage floor support angles. Cut out for header tank straps. Fabricated rear mount angle for center console. Riveted to St 2b closeout. Drilled and attached center console. Trimmed flap lever cover and test fit.
20220426_145421.jpg
20220426_140040.jpg
20220426_140050.jpg
20220426_113338.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.